Case study

The beam that would have failed

A luxury spec home on a narrow, high-traffic coastal lot in Belleair Beach — engineered for 150 mph wind on a lot split between two flood zones. Two structural interventions, months apart: a wall removed during design left a beam unable to carry the load above it, caught before the pour — and an elevator retrofit after the house was already built.

Wall removed mid-design · beam caught before the pour · came through Hurricanes Helene and Milton with zero structural damage · Flood Zone AE/VE · 150 mph wind, Exposure B

See the finished home, room by room →

The beam that would have failed

The house was originally designed with a wall positioned to carry part of the load above it — shortening the span the beam in that location actually needed to cover. Later in the design process, that wall was removed to open up the floor plan. The beam above it was never resized for the longer, now-unsupported span it would actually have to carry.

“I figured out — that’s why my engineering degree came in handy — that the engineer didn’t redesign the beam that can support the 30-foot span. I believe if we just followed the plans, the beam would have collapsed.”

Sasa caught the discrepancy before the concrete was poured and brought it to the engineer with two ways to fix it: reinforce the beam to carry the full 30-foot span on its own, or restore the wall and keep the beam as originally designed for 10 feet. They chose to put the wall back — the simpler fix, and the one that matched the plan the house was actually engineered to.

Wide shot of open footing trenches with rebar cages and vertical dowels tied in, ahead of a concrete pour, with neighboring houses visible beyond the lot line Heavy multi-ply, bolted wood beam spanning between two CMU columns, temporarily supported on adjustable steel shoring posts, with roof trusses landing on top

The fix: the original plan, restored

The wall went back in as originally drawn, restoring the shorter, supported span the beam above it had actually been engineered to carry. The beam itself was never changed — the fix was putting back what the design already called for, not re-engineering around its removal.

The photos below are from during construction, while the beam and its connections were still temporarily shored — standard sequencing for this kind of framing, not evidence of any special reinforcement.

Close-up of a large built-up beam along a CMU wall, temporarily shored from below on steel posts

Finished

The shell went from wrapped and weatherproofed to a completed, sold home — a low-slung modern facade built to the plan as originally engineered. See the full interior →

Two-story home shell wrapped in Tyvek HomeWrap, window openings cut in, ladder against the facade Completed two-story modern white home with a sloped shed roof, dark garage doors, second-floor balcony, and address marker photographed from the driveway

Tested by Helene and Milton, and it held

The completed house went through both Hurricane Helene and Hurricane Milton in the 2024 season without any structural damage. What it needed afterward was new grass and a pressure-washed garage — nothing more.

Six months later, an elevator nobody planned for

The original plans didn’t include an elevator — a decision made during design, before construction, to manage upfront cost. Once the finished home went on the market, it sat for six months. The consistent feedback from prospective buyers: no elevator.

Nikic was brought back to retrofit one into a home that was already built. That meant cutting into the existing concrete slab, pouring new footings to carry the shaft, cutting through structural floor trusses on each level while temporarily resupporting the building above them, and building a new masonry shaft from the foundation through the roofline — all while preserving the existing interior finishes.

“We had to cut into the existing slab, get a new foundation, then cut through the trusses that go through the middle of the house. We had to resupport everything and make sure it was going to hold the rest of the structure while we built the elevator shaft.”

Sasa calls the retrofit the most demanding part of the entire project — more so than the original build. Asked what he’d do differently, his answer was immediate:

“I’ll install the elevator at the same time as we build the house.”

The lesson isn’t about this one decision. It’s that the cost of deferring a decision is almost always higher than making it correctly the first time — something that shows up as clearly in a finished house that won’t sell as it does in a beam that’s left uncorrected after a wall comes out.

Interior wood-framed shaft cut into an existing house structure, with a PVC waterproof shower-pan style liner and center drain installed at the base, plumbing stubs visible in the surrounding walls

Building on a lot with real complexity?

Send Sasa the plans, and he’ll tell you what actually needs checking before anything gets poured.