Segment: Hurricane rebuild
A Twin Duplex on 2nd Street, Madeira Beach
Portfolio A twin duplex on 2nd Street, Madeira Beach Two mirror-image units sharing a two-hour fire-rated demising wall, each on an elevated pile foundation — Design Flood Elevation 13.00′ NAVD88, engineered for 150 mph wind at Exposure D. A continuous…
A Waterfront Build on Gulf Blvd, Treasure Island
Portfolio A waterfront build on Gulf Blvd, Treasure Island 4,233 square feet under air, held entirely on an elevated pile foundation — the living floor sits at +17′-6″ NAVD88, well above both the 10-foot base flood elevation and the 12-foot…